Atomstroyexport (ASE) announced it has installed the reactor pressure vessel (RPV) of unit 1 of the nuclear power plant under construction at Ostrovets in Belarus. The RPV, which weighs more than 330 tonnes, is 11 meters long and 4.5 m in diameter, was placed in position at 8.30pm on 1 April.